Extreme LED
38" Curved X6S Slim Amber/White 180W LED Light Bar & Harness
38" Curved X6S Slim Amber/White 180W LED Light Bar & Harness
Search matches make and model, not model year.
We don't have year-by-year fitment listed for this part yet. If you're not certain it fits your machine, ask us first — it takes a minute and saves a return.
Not sure? Text your year, make and model to 719-428-6837 or use Build Concierge and we'll confirm the right part. Freight-heavy parts can't be returned cheaply, so it's worth asking. Need a factory part instead? We can order OEM parts for any major make.
Couldn't load pickup availability
Why Buy From SxS Network?
Located at Pikes Peak International Raceway, home of Adrenaline Park and Peak Adrenaline. We run many of these parts on our personal Maverick R and X3 rigs.
Not sure what fits your build? Call or text Tim directly at 719-428-6837. Real riders, real advice — no call centers.
Based in Fountain, CO. Support a Colorado business that actually rides.
Most orders leave the manufacturer in 1–2 business days — no middle warehouse, no re-boxing. Ship-by date shown above.
Product Description
- 17,100 lumens
- Super Slim, only 1-5/8" Tall
- 5w CREE LEDs - 180W total
- Versatile Amber and White Lighting with Combo Beam Pattern
- Amber Lenses are Flood Beam, White Lenses are Spot Beam
- Waterproof
- Lifetime Warranty
- Back of light bar to front of curve is ~6"
There are plenty of reasons to buy your amber white light bar from Extreme LED. One of those reasons is that we provide you with options that you can't find anywhere else. You can fulfill your need for variety with this amber-white LED light bar! The new X6S 5-watt series amber white LED Light bar offers you the choice between amber and white lights. You can use just the white LED light bar for extra lighting at night, the amber LED light bar for extra contrast (great for fog and snow), or combine the white and amber for maximum light and visibility!
The applications for this amber/white LED light bar are endless. Whether you're out in the country going mudding with your buddies at night or going for an early morning hunting excursion. Extreme LED has the right equipment to shine light on your path.
We understand you need a reliable amber and white LED light to guide the way without costing a ton. We keep you in mind when it comes to pricing. We don't want you to have to break the bank just for quality lights.
With high-quality aluminum construction, our bars are rated to keep dust, water, and other particles out of the internal components, our lights will take you wherever your journey may take you and whatever abuse you throw at it.
Includes:
- Amber White Combo Light Bar
- Universal mounting brackets (scroll through product images to see)
- Wiring Harness for independent white and amber light control (has two switches, one for the white lights and one for the amber lights; scroll through product images to see)
Not seeing what you're looking for here? Check out our full stock of LED light bars! Worried about buying from us? Most customers are shocked by just how bright these are... but what if they're not exactly what you wanted? If you don't love them, send them back. See more details in our FAQ.
